Temporary Builders Supply Parramatta
Metered, safe site power from the first day of the build, and the permanent connection at handover.
Every Parramatta build needs safe site power from day one. Duplexes, knockdown rebuilds and big renovations all start with the old supply disconnected and a temporary builders supply installed so the trades can work. At the end, the new homes connect permanently and the temporary supply comes out.
Overhead or underground
Overhead streets. Most of Parramatta. A temporary pole near the front boundary takes a service line from the street pole, with a meter and outlets for the trades.
Underground streets. A freestanding site board connects to the pit at the boundary.
The right order
- The old house is permanently disconnected with a power disconnection and reconnection
- Site power goes in on the same visit
- The build runs on site power
- The permanent connection is made at handover, and the temporary supply removed
If the new homes will have EV chargers, big solar or batteries, lodge the three phase power upgrade application early so it’s ready for handover.
Duplexes
Duplex sites usually run on one site supply during construction. At handover, each dwelling gets its own permanent connection and meter. We plan both from the start so the applications are lodged in time.
Placement
We place the supply where it won’t need to move: clear of the slab, the driveway and the scaffold line. On narrow Parramatta blocks that takes some planning, and we do it on the first visit with the builder.
What we need
The address, builder’s details, a site plan, single or three phase, the start date and confirmation that a retailer account is open for the site.
Safety on site
Site supplies get knocked by machinery and splashed with concrete. We install them with the protection the rules require and check them if they’re damaged. If an overhead line runs near the work area, we advise on keeping cranes and scaffold clear.
Common hold-ups
No retailer account, so no meter. The pole placed where the driveway goes. Single phase ordered for a three phase home. Demolition booked before the disconnection. We go through each at the start.
Handover
Once the new meter boards are ready, the permanent connections go live, get tested and certified, and the site pole or board is taken away. Each owner receives their compliance certificate.
Where we work
Builders across the area use us, from duplex sites in level 2 electrician Granville to rebuilds in Toongabbie and Carlingford.
Moving it mid-build
When driveways are poured or landscaping starts, the site supply sometimes has to move. With a few days’ notice we can relocate it with a short disconnection. Planning the spot well at the start usually avoids the move altogether.
Weather and damage
Summer storms and heat are hard on site equipment. If the site supply is knocked over or damaged, keep the trades clear and call us. We’ll make it safe and get the site running again.
Neighbouring lots
On streets where several lots are being rebuilt at once, we plan supply positions together so trucks and pumps have room and nothing lands where the next lot’s driveway goes.
Small renovations
Not every job needs a full site supply. For a smaller renovation where the house stays connected, the trades can often work off the existing supply. We’ll tell you which way suits your project.
Extra outlets
If your builder needs more outlets or a second board for a large site, tell us when booking and we’ll size the supply to suit.
Certificates for your records
Every site supply is tested and certified when it’s installed. Keep the paperwork on site; inspectors and safety officers sometimes ask to see it. When the permanent supply is connected, you get a second certificate for that.
Book site power
Call the Parramatta level 2 electrician team with your start date.
Updated
What good temporary builders supply looks like
Temporary Builders Supply across Parramatta
Temporary Builders Supply in Parramatta: step by step
- Pick the spotClear of the slab, driveway, excavation and scaffold.
- PaperworkNetwork notified; you get the wording for your retailer account.
- InstallTemporary pole or site board connected and tested.
- Hand overPermanent supply connected, site power removed.
Related services
Power Disconnection and ReconnectionSafe disconnection and reconnection of the network supply for renovations, demolitions, re-roofing and switchboard work.
Three Phase Power UpgradeUpgrading a single-phase home to three phase power for EV chargers, ducted air conditioning, pools and big renovations.
Temporary Builders Supply questions in Parramatta
Something else on your mind? Call 02 9158 9915 and ask.
We're building a duplex. Do we need two site supplies?
Usually one site supply covers the build; each dwelling gets its own permanent connection at handover.
Can site power be three phase?
Yes, where three phase is available at the street.
Who sets up the retailer account?
You or your builder. We give you the details the retailer needs.