Skip to content
Underground power trench at a Harris Park cottage
Level 2 electrical

Overhead to Underground Conversion Parramatta

The wire across your yard replaced with a cable in conduit, so trees, trucks and second storeys stop being a problem.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

A service line strung across your front yard is fine until it isn’t. In Parramatta it gets in the way of second storeys, new carports, cranes on rebuild sites and the big trees that line many older streets. An overhead to underground conversion replaces that line with a cable in conduit, run from the street pole or pit to your meter board.

Why Parramatta owners go underground

Rebuilds and duplexes. The site is already open, and the new home can be designed with no raiser on the facade.

Second storeys. Lifting the roofline often means the old attachment point no longer works. Going underground avoids a tall raiser.

Trees. Jacarandas and gums on older streets drop branches on service lines in storms.

Heritage frontages. A Harris Park or North Parramatta cottage looks better without a wire and bracket on the front wall.

Driveways and carports. A low line over a driveway limits trucks, caravans and new carports.

How it works on an overhead street

Most Parramatta streets still have overhead mains on timber poles. We fit conduit up the street pole, trench or bore to your property, and run the cable to your meter board. The network connects the cable at the pole. Once it’s live, the old line comes down and the raiser is removed.

How it works on an underground street

Newer streets and some rebuild areas already have pits at the boundary. Then it’s usually a short run from the pit to the meter board, often done alongside a consumer mains upgrade.

Getting the route right

We plan the route around gardens, paths, pools, gas and water. Where a driveway or paved area is in the way, we can bore underneath it. On tight Federation blocks with narrow side passages, we work out the cleanest path before we dig.

The application

Going underground needs an application to the network, which confirms the connection point and requirements. In most of Parramatta that’s Endeavour Energy; around Epping it can be Ausgrid. We lodge it and manage it to approval.

On a rebuild site

During a knockdown rebuild, we coordinate the trench with the builder so it’s laid before landscaping and driveway pours. The old house is disconnected first with a power disconnection and reconnection, and site power runs during the build. At handover the new home connects straight to the underground supply.

Combining with three phase

If you’re planning EV charging or big solar, lay conduit sized for a future three phase power upgrade. It costs little extra and saves digging again later.

Your yard afterwards

The trench is backfilled and compacted. Turf or garden beds are reinstated as agreed. The old line, bracket and raiser come off, which tidies the front of the house straight away.

Where we do this

Undergrounding is common across the area, especially in Harris Park, North Parramatta, Ermington and on rebuild sites in level 2 electrician Wentworthville.

Pits and spare conduit

Long runs get a pit where the route turns, so new cable can be pulled through later without digging the yard up again. If you might add three phase or a second dwelling, tell us and we’ll size the conduit for it.

Get a price

Call the level 2 electrician Parramatta team. We’ll look at the route and give you a fixed written price.

Updated

Cost depends on the distance, what the trench crosses (lawn, concrete, a driveway), whether we bore under paving, and the network's requirements at the pole. We quote a fixed figure after a site look.

What good overhead to underground conversion looks like

Close-up of overhead to underground conversion on a home in the Parramatta area
What overhead to underground conversion looks like up close on a typical Parramatta area home.
Signs that overhead to underground conversion needs attention
Typical signs that it needs attention.

Overhead to Underground Conversion in Parramatta: step by step

  1. Plan the routePole or pit to meter board, around gardens, paths and services.
  2. ApplyWe lodge the network application and confirm the connection point.
  3. Trench and installConduit laid, cable pulled, pits fitted where needed.
  4. Cut overNew cable connected, old line and raiser removed, certified.

Overhead to Underground Conversion questions in Parramatta

Something else on your mind? Call 02 9158 9915 and ask.

Does the street need underground power for this to work?

No. On overhead streets the cable runs down the street pole in conduit and underground to your house.

Can you bore under our new driveway?

Usually, yes. Boring avoids cutting finished concrete.

Is this worth doing during a knockdown rebuild?

It's the best time. The yard is already dug up and the new home can be designed without a raiser.

Need a Level 2 electrician in Parramatta?

📞 Call now Free quote